Case Studies

Outcomes we canprove, in production.

Every case study below shipped to production for a named client engagement. Metrics are the ones the client's board saw — not marketing rounding.

  • 6 flagship programmes
  • 6 industries
  • Production-proven
Engineering team delivering client platforms at Accumen Software
Meridian Capital Group — Real-time settlement platform for a global bankBanking & Financial Services

Meridian Capital Group

Real-time settlement platform for a global bank

We re-architected a 20-year-old settlement stack into event-driven microservices, migrated 14 million daily transactions with zero unplanned downtime and gave regulators a live audit trail.

platform uptime post-migration
99.99%platform uptime post-migration
faster settlement cycle
3.2xfaster settlement cycle
Discuss a similar project
HealthNet Systems — Unified patient data platform across 42 hospitalsHealthcare & Life Sciences

HealthNet Systems

Unified patient data platform across 42 hospitals

A governed FHIR-based data platform united 42 hospitals onto one patient record, powering clinicians with real-time histories and cutting claims processing from weeks to days.

patients on one record
4.1Mpatients on one record
faster claims processing
38%faster claims processing
Discuss a similar project
Vantage Retail Group — Unified commerce replatform across 11 marketsRetail & E-Commerce

Vantage Retail Group

Unified commerce replatform across 11 markets

Eleven market sites, one commerce core. Headless storefronts and synchronised inventory lifted online revenue by a quarter while infrastructure spend fell by $4.2M a year.

online revenue uplift
+24%online revenue uplift
annual infrastructure savings
$4.2Mannual infrastructure savings
Discuss a similar project
Aurora Mobility — Connected-vehicle platform for 1.2M carsManufacturing & Automotive

Aurora Mobility

Connected-vehicle platform for 1.2M cars

A telematics platform ingesting 2 billion signals a day — with OTA update safety cases engineered to ISO 26262 and 99.95% service reliability across three continents.

vehicles connected
1.2Mvehicles connected
service reliability
99.95%service reliability
Discuss a similar project
TerraLogix — Real-time visibility across 60,000 daily shipmentsLogistics & Mobility

TerraLogix

Real-time visibility across 60,000 daily shipments

Event-driven tracking and route optimisation across a 40-country network cut last-mile times by nearly a third and lifted on-time delivery above 99%.

faster last-mile delivery
31%faster last-mile delivery
on-time SLA attainment
99.2%on-time SLA attainment
Discuss a similar project
HelioGrid Energy — Grid analytics for a renewables operatorEnergy & Utilities

HelioGrid Energy

Grid analytics for a renewables operator

Streaming analytics across 6.4 GW of solar and wind generation gave operators early-warning asset intelligence, cutting grid losses by 18% in the first year.

grid loss reduction
18%grid loss reduction
generation monitored
6.4 GWgeneration monitored
Discuss a similar project

Why clients stay

96% of clients return with a second programme

We earn the renewal the way we earned the first project — named architects, honest estimates and platforms that hold their SLAs years later.

Joint client and Accumen Software delivery team

Let's build together

Your programme could be the next proof point

Bring us the metric you need to move — we'll bring the engineers who have moved it before.